Field Guide
The tables below provide an indication of which fields are populated when files of different types are read using MPXJ The tables are not hand-crafted: they have been generated from test data and are therefore may be missing some details.
Project
Core Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AM Text | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Activity ID Increment | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Activity ID Increment Based On Selected Activity | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Activity ID Prefix | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Activity ID Suffix | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Actual Cost | ✓ | |||||||||||||||||||||||
| Actual Duration | ✓ | |||||||||||||||||||||||
| Actual Start | ✓ | |||||||||||||||||||||||
| Actual Work | ✓ | |||||||||||||||||||||||
| Actuals In Sync | ✓ | |||||||||||||||||||||||
| Application Version | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Author | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Auto Add New Resources and Tasks | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Auto Filter | ✓ | |||||||||||||||||||||||
| Auto Link | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Bar Text Date Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Calculate Float on Finish Date of Each Project | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Calculate Multiple Float Paths | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Calculate Multiple Float Paths Ending With Activity Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Calculate Multiple Paths Using Total Float | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Category | ✓ | ✓ | ||||||||||||||||||||||
| Comments | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Company | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Compute Start to Start Lag From Early Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Consider Assignments In Other Project With Priority Equal or Higher Than | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Content Status | ✓ | |||||||||||||||||||||||
| Content Type | ✓ | |||||||||||||||||||||||
| Cost | ✓ | |||||||||||||||||||||||
| Creation Date | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Critical Activity Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Critical Slack Limit | ✓ | ✓ | ||||||||||||||||||||||
| Currency Code | ✓ | ✓ | ||||||||||||||||||||||
| Currency Digits | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Currency Symbol | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Currency Symbol Position | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Current Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Custom Properties | ✓ | |||||||||||||||||||||||
| Date Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Date Order | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Date Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Days per Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Decimal Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Default Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Default Duration Is Fixed | ✓ | |||||||||||||||||||||||
| Default End Time | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Default Overtime Rate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Default Standard Rate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Default Start Time | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Default Work Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Document Version | ✓ | |||||||||||||||||||||||
| Duration | ✓ | ✓ | ||||||||||||||||||||||
| Earned Value Method | ✓ | |||||||||||||||||||||||
| Editable Actual Costs | ✓ | ✓ | ||||||||||||||||||||||
| Editing Time | ✓ | |||||||||||||||||||||||
| Export Flag | ✓ | ✓ | ||||||||||||||||||||||
| Extended Creation Date | ✓ | |||||||||||||||||||||||
| File Application | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| File Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Finish Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Fiscal Year Start | ✓ | |||||||||||||||||||||||
| Fiscal Year Start Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Full Application Name | ✓ | |||||||||||||||||||||||
| GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Honor Constraints | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Hyperlink Base | ✓ | |||||||||||||||||||||||
| Ignore Relationships To And From Other Projects | ✓ | |||||||||||||||||||||||
| Inserted Projects Like Summary | ✓ | |||||||||||||||||||||||
| Keywords | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Language | ✓ | |||||||||||||||||||||||
| Last Author | ✓ | |||||||||||||||||||||||
| Last Printed | ✓ | |||||||||||||||||||||||
| Last Saved | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Level All Resources | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Level Resources Only Within Activity Total Float | ✓ | ✓ | ||||||||||||||||||||||
| Leveling Priorities | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Limit Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Location Unique ID | ✓ | |||||||||||||||||||||||
| MPP File Type | ✓ | |||||||||||||||||||||||
| MPX Code Page | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| MPX Delimiter | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| MPX File Version | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| MPX Program Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Manager | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Maximum Percentage to Overallocate Resources | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Microsoft Project Server URL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Minutes per Day | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Minutes per Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Minutes per Week | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Minutes per Year | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Multiple Critical Paths | ✓ | ✓ | ||||||||||||||||||||||
| Must Finish By | ✓ | ✓ | ||||||||||||||||||||||
| Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| New Task Start Is Project Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| New Tasks Are Effort Driven | ✓ | ✓ | ||||||||||||||||||||||
| New Tasks Are Manual | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| New Tasks Estimated | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| PM Text | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Percentage Complete | ✓ | |||||||||||||||||||||||
| Planned Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Presentation Format | ✓ | |||||||||||||||||||||||
| Preserve Minimum Float When Leveling | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Preserve Scheduled Early and Late Dates | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Project Code Values | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Project Externally Edited | ✓ | |||||||||||||||||||||||
| Project File Path | ✓ | |||||||||||||||||||||||
| Project ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Project Title | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Project Website URL | ✓ | ✓ | ||||||||||||||||||||||
| Relationship Lag Calendar | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Resource Pool File | ✓ | |||||||||||||||||||||||
| Revision | ✓ | ✓ | ||||||||||||||||||||||
| Schedule From | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Scheduled Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Short Application Name | ✓ | |||||||||||||||||||||||
| Show Project Summary Task | ✓ | |||||||||||||||||||||||
| Split In Progress Tasks | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Start Variance | ✓ | |||||||||||||||||||||||
| Status Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Subject | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Template | ✓ | |||||||||||||||||||||||
| Thousands Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Time Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Time Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Total Slack Calculation Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Updating Task Status Updates Resource Status | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Use Expected Finish Dates | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| WBS Code Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Week Start Day | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| When Scheduling Progressed Activities Use | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Work | ✓ | |||||||||||||||||||||||
| Work 2 | ✓ |
Baseline Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Baseline1 Date | ✓ | |||||||||||||||||||||||
| Baseline2 Date | ✓ | |||||||||||||||||||||||
| Baseline3 Date | ✓ | |||||||||||||||||||||||
| Baseline4 Date | ✓ | |||||||||||||||||||||||
| Baseline5 Date | ✓ | |||||||||||||||||||||||
| Baseline6 Date | ✓ | |||||||||||||||||||||||
| Baseline7 Date | ✓ | |||||||||||||||||||||||
| Baseline8 Date | ✓ | |||||||||||||||||||||||
| Baseline9 Date | ✓ | |||||||||||||||||||||||
| Baseline10 Date | ✓ | |||||||||||||||||||||||
| Baseline Calendar Name | ✓ | ✓ | ||||||||||||||||||||||
| Baseline Cost | ✓ | |||||||||||||||||||||||
| Baseline Date | ✓ | ✓ | ||||||||||||||||||||||
| Baseline Duration | ✓ | |||||||||||||||||||||||
| Baseline Finish | ✓ | ✓ | ||||||||||||||||||||||
| Baseline Project Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Start | ✓ | ✓ | ||||||||||||||||||||||
| Baseline Type Name | ✓ | |||||||||||||||||||||||
| Baseline Work | ✓ | |||||||||||||||||||||||
| Last Baseline Update Date | ✓ | |||||||||||||||||||||||
| Project Is Baseline | ✓ |
Task
Core Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| % Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
| % Work Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| ACWP | ✓ | ✓ | ||||||||||||||||||||||
| Active | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Activity Code Values | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Activity ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Activity Percent Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||
| Activity Status | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Activity Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Actual Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Actual Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
| Actual Duration Units | ✓ | ✓ | ||||||||||||||||||||||
| Actual Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
| Actual Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Actual Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Work Protected | ✓ | |||||||||||||||||||||||
| Bar Name | ✓ | |||||||||||||||||||||||
| Bid Item | ✓ | |||||||||||||||||||||||
| Board Status ID | ✓ | |||||||||||||||||||||||
| Budget Cost | ✓ | |||||||||||||||||||||||
| Budget Work | ✓ | |||||||||||||||||||||||
| CV | ✓ | |||||||||||||||||||||||
| Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Category of Work | ✓ | |||||||||||||||||||||||
| Complete Through | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Constraint Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
| Constraint Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Contact | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
| Cost Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Created | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Critical | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Deadline | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Department | ✓ | |||||||||||||||||||||||
| Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Duration Units | ✓ | |||||||||||||||||||||||
| Duration Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Early Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
| Early Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
| Earned Value Method | ✓ | |||||||||||||||||||||||
| Effort Driven | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Estimated | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Expanded | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Expected Finish | ✓ | ✓ | ||||||||||||||||||||||
| Expense Items | ✓ | ✓ | ✓ | |||||||||||||||||||||
| External Early Start | ✓ | ✓ | ||||||||||||||||||||||
| External Late Finish | ✓ | ✓ | ||||||||||||||||||||||
| External Project | ✓ | ✓ | ||||||||||||||||||||||
| External Task | ✓ | ✓ | ||||||||||||||||||||||
| Feature of Work | ✓ | |||||||||||||||||||||||
| Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Finish Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Finish Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Fixed Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Fixed Cost Accrual | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Free Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
| Hammock Code | ✓ | |||||||||||||||||||||||
| Hide Bar | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Hyperlink | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Hyperlink Address | ✓ | ✓ | ||||||||||||||||||||||
| Hyperlink Data | ✓ | |||||||||||||||||||||||
| Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
| Hyperlink SubAddress | ✓ | |||||||||||||||||||||||
| ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Ignore Resource Calendar | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Late Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||
| Late Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||
| Level Assignments | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Leveling Can Split | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Leveling Delay | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Leveling Delay Units | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Longest Path | ✓ | ✓ | ||||||||||||||||||||||
| ✓ | ||||||||||||||||||||||||
| Manager | ✓ | |||||||||||||||||||||||
| Manual Duration | ✓ | ✓ | ||||||||||||||||||||||
| Manual Duration Units | ✓ | |||||||||||||||||||||||
| Marked | ✓ | ✓ | ||||||||||||||||||||||
| Milestone | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
| Notes | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
| Null | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Level | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Outline Number | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Overall Percent Complete | ✓ | |||||||||||||||||||||||
| Overallocated | ✓ | |||||||||||||||||||||||
| Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Overtime Work | ✓ | |||||||||||||||||||||||
| Parent Task Unique ID | ✓ | |||||||||||||||||||||||
| Percent Complete Type | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Phase of Work | ✓ | |||||||||||||||||||||||
| Physical % Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Planned Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Planned Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Planned Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Planned Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Preleveled Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Preleveled Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Primary Resource Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Priority | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Project | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Recalc Outline Codes | ✓ | |||||||||||||||||||||||
| Recurring | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Recurring Data | ✓ | |||||||||||||||||||||||
| Regular Work | ✓ | ✓ | ||||||||||||||||||||||
| Remaining Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Remaining Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
| Remaining Early Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Early Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Late Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Late Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
| Remaining Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Resource Names | ✓ | ✓ | ||||||||||||||||||||||
| Responsibility Code | ✓ | |||||||||||||||||||||||
| Resume | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Resume No Earlier Than | ✓ | |||||||||||||||||||||||
| Resume Valid | ✓ | |||||||||||||||||||||||
| Rollup | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Scheduled Duration | ✓ | |||||||||||||||||||||||
| Scheduled Finish | ✓ | |||||||||||||||||||||||
| Scheduled Start | ✓ | |||||||||||||||||||||||
| Secondary Constraint Date | ✓ | ✓ | ||||||||||||||||||||||
| Secondary Constraint Type | ✓ | ✓ | ||||||||||||||||||||||
| Section | ✓ | |||||||||||||||||||||||
| Sequence Number | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Show Duration Text | ✓ | |||||||||||||||||||||||
| Show Finish Text | ✓ | |||||||||||||||||||||||
| Show Start Text | ✓ | |||||||||||||||||||||||
| Splits | ✓ | ✓ | ||||||||||||||||||||||
| Sprint ID | ✓ | |||||||||||||||||||||||
| Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Start Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Start Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
| Steps | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Stop | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Subproject File | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Subproject GUID | ✓ | |||||||||||||||||||||||
| Subproject Task ID | ✓ | ✓ | ||||||||||||||||||||||
| Subproject Task Unique ID | ✓ | |||||||||||||||||||||||
| Subproject Tasks Unique ID Offset | ✓ | |||||||||||||||||||||||
| Summary | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Summary Progress | ✓ | |||||||||||||||||||||||
| Suspend Date | ✓ | ✓ | ||||||||||||||||||||||
| Task Calendar GUID | ✓ | |||||||||||||||||||||||
| Task Mode | ✓ | ✓ | ||||||||||||||||||||||
| Task Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Total Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
| Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Unique ID Successors | ✓ | |||||||||||||||||||||||
| WBS | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
| Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
| Work Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Baseline Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Baseline1 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline1 Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline1 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline1 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline1 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline1 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline1 Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline1 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline1 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline1 Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline1 Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline2 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline2 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline2 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline2 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline2 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline2 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline2 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline3 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline3 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline3 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline3 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline3 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline3 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline4 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline4 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline4 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline4 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline4 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline4 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline5 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline5 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline5 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline5 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline5 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline5 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline6 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline6 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline6 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline6 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline6 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline6 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline7 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline7 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline7 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline7 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline7 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline7 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline8 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline8 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline8 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline8 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline8 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline8 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline9 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline9 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline9 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline9 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline9 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline9 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline10 Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline10 Deliverable Finish | ✓ | |||||||||||||||||||||||
| Baseline10 Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline10 Duration Units | ✓ | |||||||||||||||||||||||
| Baseline10 Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline10 Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline10 Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline10 Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline10 Fixed Cost | ✓ | |||||||||||||||||||||||
| Baseline10 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline10 Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline10 Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline Budget Work | ✓ | |||||||||||||||||||||||
| Baseline Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
| Baseline Deliverable Finish | ✓ | |||||||||||||||||||||||
| Baseline Deliverable Start | ✓ | |||||||||||||||||||||||
| Baseline Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Baseline Duration Units | ✓ | |||||||||||||||||||||||
| Baseline Estimated Duration | ✓ | |||||||||||||||||||||||
| Baseline Estimated Finish | ✓ | |||||||||||||||||||||||
| Baseline Estimated Start | ✓ | |||||||||||||||||||||||
| Baseline Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Baseline Fixed Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
| Baseline Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Baseline Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Custom Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cost1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Cost2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Cost3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Duration1 Units | ✓ | |||||||||||||||||||||||
| Duration2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Duration2 Units | ✓ | |||||||||||||||||||||||
| Duration3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Duration3 Units | ✓ | |||||||||||||||||||||||
| Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration4 Units | ✓ | |||||||||||||||||||||||
| Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration5 Units | ✓ | |||||||||||||||||||||||
| Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration6 Units | ✓ | |||||||||||||||||||||||
| Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration7 Units | ✓ | |||||||||||||||||||||||
| Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration8 Units | ✓ | |||||||||||||||||||||||
| Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration9 Units | ✓ | |||||||||||||||||||||||
| Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration10 Units | ✓ | |||||||||||||||||||||||
| Finish1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Finish2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Finish3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Finish4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Finish5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag6 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag7 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag8 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag9 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag10 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Flag11 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag12 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag13 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag14 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag15 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag16 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag17 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag18 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag19 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag20 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Number1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Number2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Number3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Number4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Number5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Number6 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code1 Index | ✓ | |||||||||||||||||||||||
| Outline Code2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code2 Index | ✓ | |||||||||||||||||||||||
| Outline Code3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code3 Index | ✓ | |||||||||||||||||||||||
| Outline Code4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code4 Index | ✓ | |||||||||||||||||||||||
| Outline Code5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code5 Index | ✓ | |||||||||||||||||||||||
| Outline Code6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code6 Index | ✓ | |||||||||||||||||||||||
| Outline Code7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code7 Index | ✓ | |||||||||||||||||||||||
| Outline Code8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code8 Index | ✓ | |||||||||||||||||||||||
| Outline Code9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code9 Index | ✓ | |||||||||||||||||||||||
| Outline Code10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code10 Index | ✓ | |||||||||||||||||||||||
| Start1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text1 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Text2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text6 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text7 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text8 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text9 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Enterprise Data | ✓ | |||||||||||||||||||||||
| Enterprise Duration1 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration2 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration3 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration4 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration5 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration6 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration7 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration8 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration9 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration10 Units | ✓ | |||||||||||||||||||||||
| Enterprise Project Date1 | ✓ | |||||||||||||||||||||||
| Enterprise Project Date2 | ✓ | |||||||||||||||||||||||
| Enterprise Project Date3 | ✓ | |||||||||||||||||||||||
| Enterprise Project Date4 | ✓ | |||||||||||||||||||||||
| Enterprise Project Number2 | ✓ | |||||||||||||||||||||||
| Enterprise Project Number4 | ✓ | |||||||||||||||||||||||
| Enterprise Project Number5 | ✓ | |||||||||||||||||||||||
| Enterprise Project Number22 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text1 | ✓ | ✓ | ||||||||||||||||||||||
| Enterprise Project Text2 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text3 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text4 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text5 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text6 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text8 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text9 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text10 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text11 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text12 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text13 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text14 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text15 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text16 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text17 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text18 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text19 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text21 | ✓ | |||||||||||||||||||||||
| Enterprise Project Text40 | ✓ | ✓ |
Resource
Core Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| % Work Complete | ✓ | |||||||||||||||||||||||
| ACWP | ✓ | ✓ | ||||||||||||||||||||||
| Accrue At | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Active | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Actual Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Actual Work Protected | ✓ | |||||||||||||||||||||||
| Availability Data | ✓ | |||||||||||||||||||||||
| Available From | ✓ | |||||||||||||||||||||||
| Available To | ✓ | |||||||||||||||||||||||
| BCWS | ✓ | |||||||||||||||||||||||
| Base Calendar | ✓ | |||||||||||||||||||||||
| Booking Type | ✓ | ✓ | ||||||||||||||||||||||
| Budget | ✓ | ✓ | ||||||||||||||||||||||
| Budget Cost | ✓ | |||||||||||||||||||||||
| Budget Work | ✓ | |||||||||||||||||||||||
| CV | ✓ | |||||||||||||||||||||||
| Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Calendar GUID | ✓ | |||||||||||||||||||||||
| Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
| Can Level | ✓ | ✓ | ||||||||||||||||||||||
| Code | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Cost Center | ✓ | ✓ | ||||||||||||||||||||||
| Cost Per Use | ✓ | |||||||||||||||||||||||
| Cost Rate A | ✓ | |||||||||||||||||||||||
| Cost Rate B | ✓ | |||||||||||||||||||||||
| Cost Rate C | ✓ | |||||||||||||||||||||||
| Cost Rate D | ✓ | |||||||||||||||||||||||
| Cost Rate E | ✓ | |||||||||||||||||||||||
| Cost Variance | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Created | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Currency Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Default Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Description | ✓ | |||||||||||||||||||||||
| Email Address | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
| GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Generic | ✓ | ✓ | ||||||||||||||||||||||
| Group | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Hyperlink | ✓ | ✓ | ||||||||||||||||||||||
| Hyperlink Address | ✓ | |||||||||||||||||||||||
| Hyperlink Data | ✓ | |||||||||||||||||||||||
| Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
| Hyperlink SubAddress | ✓ | |||||||||||||||||||||||
| ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Initials | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Material Label | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Max Units | ✓ | |||||||||||||||||||||||
| Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Notes | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
| Overallocated | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Overtime Rate | ✓ | |||||||||||||||||||||||
| Overtime Rate Units | ✓ | |||||||||||||||||||||||
| Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Parent ID | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Peak | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Per Day | ✓ | |||||||||||||||||||||||
| Phone | ✓ | |||||||||||||||||||||||
| Phonetics | ✓ | |||||||||||||||||||||||
| Pool | ✓ | |||||||||||||||||||||||
| Primary Role Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Rate | ✓ | |||||||||||||||||||||||
| Regular Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Resource Code Values | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Resource ID | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Role | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Role Code Values | ✓ | ✓ | ||||||||||||||||||||||
| SV | ✓ | |||||||||||||||||||||||
| Sequence Number | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Shift Unique ID | ✓ | ✓ | ||||||||||||||||||||||
| Standard Rate | ✓ | |||||||||||||||||||||||
| Standard Rate Units | ✓ | |||||||||||||||||||||||
| Subproject Unique Resource ID | ✓ | |||||||||||||||||||||||
| Supply Reference | ✓ | |||||||||||||||||||||||
| Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Unit | ✓ | |||||||||||||||||||||||
| Unit of Measure Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
| Windows User Account | ✓ | |||||||||||||||||||||||
| Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Work Variance | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Workgroup | ✓ | ✓ | ✓ |
Baseline Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Baseline1 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline1 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline1 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline1 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline2 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline2 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline2 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline2 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline3 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline3 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline3 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline3 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline4 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline4 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline4 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline4 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline5 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline5 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline5 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline5 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline6 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline6 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline6 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline6 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline7 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline7 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline7 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline7 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline8 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline8 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline8 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline8 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline9 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline9 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline9 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline9 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline10 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline10 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline10 Cost | ✓ | ✓ | ||||||||||||||||||||||
| Baseline10 Work | ✓ | ✓ | ||||||||||||||||||||||
| Baseline Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline Budget Work | ✓ | |||||||||||||||||||||||
| Baseline Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Work | ✓ | ✓ | ✓ | ✓ |
Custom Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cost1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration1 Units | ✓ | |||||||||||||||||||||||
| Duration2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration2 Units | ✓ | |||||||||||||||||||||||
| Duration3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration3 Units | ✓ | |||||||||||||||||||||||
| Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration4 Units | ✓ | |||||||||||||||||||||||
| Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration5 Units | ✓ | |||||||||||||||||||||||
| Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration6 Units | ✓ | |||||||||||||||||||||||
| Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration7 Units | ✓ | |||||||||||||||||||||||
| Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration8 Units | ✓ | |||||||||||||||||||||||
| Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration9 Units | ✓ | |||||||||||||||||||||||
| Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration10 Units | ✓ | |||||||||||||||||||||||
| Finish1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag6 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag7 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag8 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag9 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag11 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag12 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag13 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag14 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag15 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag16 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag17 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag18 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag19 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Flag20 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Number1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code1 Index | ✓ | |||||||||||||||||||||||
| Outline Code2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code2 Index | ✓ | |||||||||||||||||||||||
| Outline Code3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code3 Index | ✓ | |||||||||||||||||||||||
| Outline Code4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code4 Index | ✓ | |||||||||||||||||||||||
| Outline Code5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code5 Index | ✓ | |||||||||||||||||||||||
| Outline Code6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code6 Index | ✓ | |||||||||||||||||||||||
| Outline Code7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code7 Index | ✓ | |||||||||||||||||||||||
| Outline Code8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code8 Index | ✓ | |||||||||||||||||||||||
| Outline Code9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code9 Index | ✓ | |||||||||||||||||||||||
| Outline Code10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Outline Code10 Index | ✓ | |||||||||||||||||||||||
| Start1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
| Text2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Text3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Text4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Text5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Enterprise | ✓ | ✓ | ||||||||||||||||||||||
| Enterprise Data | ✓ | |||||||||||||||||||||||
| Enterprise Duration1 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration2 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration3 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration4 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration5 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration6 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration7 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration8 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration9 Units | ✓ | |||||||||||||||||||||||
| Enterprise Duration10 Units | ✓ | |||||||||||||||||||||||
| Enterprise Unique ID | ✓ |
Resource Assignment
Core Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ACWP | ✓ | ✓ | ||||||||||||||||||||||
| Actual Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Actual Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Actual Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Actual Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Actual Work Protected | ✓ | |||||||||||||||||||||||
| Assignment Delay | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Assignment GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Assignment Resource GUID | ✓ | |||||||||||||||||||||||
| Assignment Task GUID | ✓ | |||||||||||||||||||||||
| Assignment Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| BCWS | ✓ | |||||||||||||||||||||||
| Budget Cost | ✓ | ✓ | ||||||||||||||||||||||
| Budget Work | ✓ | ✓ | ||||||||||||||||||||||
| CV | ✓ | |||||||||||||||||||||||
| Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Confirmed | ✓ | |||||||||||||||||||||||
| Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Cost Account ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost Rate Table | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Created | ✓ | ✓ | ||||||||||||||||||||||
| Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Finish Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Hyperlink | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Hyperlink Address | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Hyperlink Data | ✓ | |||||||||||||||||||||||
| Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
| Hyperlink Subaddress | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Leveling Delay | ✓ | ✓ | ||||||||||||||||||||||
| Leveling Delay Units | ✓ | |||||||||||||||||||||||
| Linked Fields | ✓ | |||||||||||||||||||||||
| Notes | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Override Rate | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Owner | ✓ | |||||||||||||||||||||||
| Percent Work Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
| Planned Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Planned Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Rate Index | ✓ | ✓ | ||||||||||||||||||||||
| Rate Source | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Regular Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Assignment Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Remaining Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
| Remaining Early Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Early Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Late Finish | ✓ | ✓ | ||||||||||||||||||||||
| Remaining Late Start | ✓ | ✓ | ||||||||||||||||||||||
| Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Remaining Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||
| Resource Assignment Code Values | ✓ | ✓ | ||||||||||||||||||||||
| Resource Request Type | ✓ | |||||||||||||||||||||||
| Resource Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Response Pending | ✓ | ✓ | ||||||||||||||||||||||
| Resume | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Role Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
| SV | ✓ | |||||||||||||||||||||||
| Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
| Start Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Stop | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Task Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Team Status Pending | ✓ | ✓ | ||||||||||||||||||||||
| Timephased Actual Overtime Work | ✓ | |||||||||||||||||||||||
| Timephased Actual Work | ✓ | |||||||||||||||||||||||
| Timephased Work | ✓ | |||||||||||||||||||||||
| Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
| Variable Rate Units | ✓ | ✓ | ||||||||||||||||||||||
| Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
| Work Contour | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
| Work Variance | ✓ | ✓ | ✓ |
Baseline Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Baseline1 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline1 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline1 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline1 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline1 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline1 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline2 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline2 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline2 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline3 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline3 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline3 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline4 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline4 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline4 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline5 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline5 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline5 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline6 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline6 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline6 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline7 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline7 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline7 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline8 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline8 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline8 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline9 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline9 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline9 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline10 Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline10 Budget Work | ✓ | |||||||||||||||||||||||
| Baseline10 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline10 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline10 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline10 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Budget Cost | ✓ | |||||||||||||||||||||||
| Baseline Budget Work | ✓ | |||||||||||||||||||||||
| Baseline Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Baseline Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Baseline Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
| Timephased Baseline1 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline1 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline2 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline2 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline3 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline3 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline4 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline4 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline5 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline5 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline6 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline6 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline7 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline7 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline8 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline8 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline9 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline9 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline10 Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline10 Work | ✓ | |||||||||||||||||||||||
| Timephased Baseline Cost | ✓ | |||||||||||||||||||||||
| Timephased Baseline Work | ✓ |
Custom Fields
| Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cost1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration1 Units | ✓ | |||||||||||||||||||||||
| Duration2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration2 Units | ✓ | |||||||||||||||||||||||
| Duration3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration3 Units | ✓ | |||||||||||||||||||||||
| Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration4 Units | ✓ | |||||||||||||||||||||||
| Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration5 Units | ✓ | |||||||||||||||||||||||
| Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration6 Units | ✓ | |||||||||||||||||||||||
| Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration7 Units | ✓ | |||||||||||||||||||||||
| Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration8 Units | ✓ | |||||||||||||||||||||||
| Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration9 Units | ✓ | |||||||||||||||||||||||
| Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Duration10 Units | ✓ | |||||||||||||||||||||||
| Finish1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Flag20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
| Text30 | ✓ | ✓ | ✓ |