Field Guide
The tables below provide an indication of which fields are populated when files of different types are read using MPXJ The tables are not hand-crafted: they have been generated from test data and are therefore may be missing some details.
Project
Core Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
AM Text | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Activity ID Increment | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Activity ID Increment Based On Selected Activity | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Activity ID Prefix | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Activity ID Suffix | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Actual Cost | ✓ | |||||||||||||||||||||||
Actual Duration | ✓ | |||||||||||||||||||||||
Actual Start | ✓ | |||||||||||||||||||||||
Actual Work | ✓ | |||||||||||||||||||||||
Actuals In Sync | ✓ | |||||||||||||||||||||||
Application Version | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Author | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Auto Add New Resources and Tasks | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Auto Filter | ✓ | |||||||||||||||||||||||
Auto Link | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Bar Text Date Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Calculate Float on Finish Date of Each Project | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Calculate Multiple Float Paths | ✓ | ✓ | ✓ | |||||||||||||||||||||
Calculate Multiple Float Paths Ending With Activity Unique ID | ✓ | ✓ | ||||||||||||||||||||||
Calculate Multiple Paths Using Total Float | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Category | ✓ | ✓ | ||||||||||||||||||||||
Comments | ✓ | ✓ | ✓ | |||||||||||||||||||||
Company | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Compute Start to Start Lag From Early Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Consider Assignments In Other Project With Priority Equal or Higher Than | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Content Status | ✓ | |||||||||||||||||||||||
Content Type | ✓ | |||||||||||||||||||||||
Cost | ✓ | |||||||||||||||||||||||
Creation Date | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Critical Activity Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Critical Slack Limit | ✓ | ✓ | ||||||||||||||||||||||
Currency Code | ✓ | ✓ | ||||||||||||||||||||||
Currency Digits | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Currency Symbol | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Currency Symbol Position | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Current Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Custom Properties | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Date Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Date Order | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Date Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Days per Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Decimal Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Default Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Default Duration Is Fixed | ✓ | |||||||||||||||||||||||
Default End Time | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Default Overtime Rate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Default Standard Rate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Default Start Time | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Default Work Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Document Version | ✓ | |||||||||||||||||||||||
Duration | ✓ | ✓ | ||||||||||||||||||||||
Earned Value Method | ✓ | |||||||||||||||||||||||
Editable Actual Costs | ✓ | ✓ | ||||||||||||||||||||||
Editing Time | ✓ | |||||||||||||||||||||||
Export Flag | ✓ | ✓ | ||||||||||||||||||||||
Extended Creation Date | ✓ | |||||||||||||||||||||||
File Application | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
File Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Finish Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Fiscal Year Start | ✓ | |||||||||||||||||||||||
Fiscal Year Start Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Full Application Name | ✓ | |||||||||||||||||||||||
GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Honor Constraints | ✓ | ✓ | ✓ | |||||||||||||||||||||
Hyperlink Base | ✓ | |||||||||||||||||||||||
Ignore Relationships To And From Other Projects | ✓ | |||||||||||||||||||||||
Inserted Projects Like Summary | ✓ | |||||||||||||||||||||||
Keywords | ✓ | ✓ | ✓ | |||||||||||||||||||||
Language | ✓ | |||||||||||||||||||||||
Last Author | ✓ | |||||||||||||||||||||||
Last Printed | ✓ | |||||||||||||||||||||||
Last Saved | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Level All Resources | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Level Resources Only Within Activity Total Float | ✓ | ✓ | ||||||||||||||||||||||
Leveling Priorities | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Limit Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Location Unique ID | ✓ | |||||||||||||||||||||||
MPP File Type | ✓ | |||||||||||||||||||||||
MPX Code Page | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
MPX Delimiter | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
MPX File Version | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
MPX Program Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Manager | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Maximum Percentage to Overallocate Resources | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Microsoft Project Server URL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Minutes per Day | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Minutes per Month | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Minutes per Week | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Minutes per Year | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Multiple Critical Paths | ✓ | ✓ | ||||||||||||||||||||||
Must Finish By | ✓ | ✓ | ||||||||||||||||||||||
Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
New Task Start Is Project Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
New Tasks Are Effort Driven | ✓ | ✓ | ||||||||||||||||||||||
New Tasks Are Manual | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
New Tasks Estimated | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
PM Text | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Percentage Complete | ✓ | |||||||||||||||||||||||
Planned Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Presentation Format | ✓ | |||||||||||||||||||||||
Preserve Minimum Float When Leveling | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Preserve Scheduled Early and Late Dates | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Project Externally Edited | ✓ | |||||||||||||||||||||||
Project File Path | ✓ | |||||||||||||||||||||||
Project ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Project Title | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Project Website URL | ✓ | ✓ | ||||||||||||||||||||||
Relationship Lag Calendar | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Resource Pool File | ✓ | |||||||||||||||||||||||
Revision | ✓ | ✓ | ||||||||||||||||||||||
Schedule From | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Scheduled Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Short Application Name | ✓ | |||||||||||||||||||||||
Show Project Summary Task | ✓ | |||||||||||||||||||||||
Split In Progress Tasks | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Start Variance | ✓ | |||||||||||||||||||||||
Status Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Subject | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Template | ✓ | |||||||||||||||||||||||
Thousands Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Time Format | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Time Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Total Slack Calculation Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Updating Task Status Updates Resource Status | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Use Expected Finish Dates | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
WBS Code Separator | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Week Start Day | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
When Scheduling Progressed Activities Use | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Work | ✓ | |||||||||||||||||||||||
Work 2 | ✓ |
Baseline Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Baseline1 Date | ✓ | |||||||||||||||||||||||
Baseline2 Date | ✓ | |||||||||||||||||||||||
Baseline3 Date | ✓ | |||||||||||||||||||||||
Baseline4 Date | ✓ | |||||||||||||||||||||||
Baseline5 Date | ✓ | |||||||||||||||||||||||
Baseline6 Date | ✓ | |||||||||||||||||||||||
Baseline7 Date | ✓ | |||||||||||||||||||||||
Baseline8 Date | ✓ | |||||||||||||||||||||||
Baseline9 Date | ✓ | |||||||||||||||||||||||
Baseline10 Date | ✓ | |||||||||||||||||||||||
Baseline Calendar Name | ✓ | ✓ | ||||||||||||||||||||||
Baseline Cost | ✓ | |||||||||||||||||||||||
Baseline Date | ✓ | ✓ | ||||||||||||||||||||||
Baseline Duration | ✓ | |||||||||||||||||||||||
Baseline Finish | ✓ | ✓ | ||||||||||||||||||||||
Baseline Project Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Start | ✓ | ✓ | ||||||||||||||||||||||
Baseline Type Name | ✓ | |||||||||||||||||||||||
Baseline Work | ✓ | |||||||||||||||||||||||
Last Baseline Update Date | ✓ | |||||||||||||||||||||||
Project Is Baseline | ✓ |
Task
Core Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
% Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
% Work Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
ACWP | ✓ | ✓ | ||||||||||||||||||||||
Active | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Activity Codes | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Activity ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Activity Status | ✓ | ✓ | ✓ | |||||||||||||||||||||
Activity Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Actual Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Actual Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
Actual Duration Units | ✓ | ✓ | ||||||||||||||||||||||
Actual Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
Actual Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Actual Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Work Protected | ✓ | |||||||||||||||||||||||
Bar Name | ✓ | |||||||||||||||||||||||
Bid Item | ✓ | |||||||||||||||||||||||
Board Status ID | ✓ | |||||||||||||||||||||||
Budget Cost | ✓ | |||||||||||||||||||||||
Budget Work | ✓ | |||||||||||||||||||||||
CV | ✓ | |||||||||||||||||||||||
Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Category of Work | ✓ | |||||||||||||||||||||||
Complete Through | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Constraint Date | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
Constraint Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Contact | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
Cost Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Created | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Critical | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Deadline | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Department | ✓ | |||||||||||||||||||||||
Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Duration Units | ✓ | |||||||||||||||||||||||
Duration Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Early Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
Early Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
Earned Value Method | ✓ | |||||||||||||||||||||||
Effort Driven | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Estimated | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Expanded | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Expected Finish | ✓ | ✓ | ||||||||||||||||||||||
Expense Items | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
External Early Start | ✓ | ✓ | ||||||||||||||||||||||
External Late Finish | ✓ | ✓ | ||||||||||||||||||||||
External Project | ✓ | ✓ | ||||||||||||||||||||||
External Task | ✓ | ✓ | ||||||||||||||||||||||
Feature of Work | ✓ | |||||||||||||||||||||||
Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Finish Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Finish Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Fixed Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Fixed Cost Accrual | ✓ | ✓ | ✓ | |||||||||||||||||||||
Free Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
Hammock Code | ✓ | |||||||||||||||||||||||
Hide Bar | ✓ | ✓ | ✓ | |||||||||||||||||||||
Hyperlink | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Hyperlink Address | ✓ | ✓ | ||||||||||||||||||||||
Hyperlink Data | ✓ | |||||||||||||||||||||||
Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
Hyperlink SubAddress | ✓ | |||||||||||||||||||||||
ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Ignore Resource Calendar | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Late Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||
Late Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||
Level Assignments | ✓ | ✓ | ✓ | |||||||||||||||||||||
Leveling Can Split | ✓ | ✓ | ✓ | |||||||||||||||||||||
Leveling Delay | ✓ | ✓ | ✓ | |||||||||||||||||||||
Leveling Delay Units | ✓ | ✓ | ✓ | |||||||||||||||||||||
Longest Path | ✓ | ✓ | ||||||||||||||||||||||
✓ | ||||||||||||||||||||||||
Manager | ✓ | |||||||||||||||||||||||
Manual Duration | ✓ | ✓ | ||||||||||||||||||||||
Manual Duration Units | ✓ | |||||||||||||||||||||||
Marked | ✓ | ✓ | ||||||||||||||||||||||
Milestone | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
Notes | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
Null | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Level | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Outline Number | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Overall Percent Complete | ✓ | |||||||||||||||||||||||
Overallocated | ✓ | |||||||||||||||||||||||
Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Overtime Work | ✓ | |||||||||||||||||||||||
Parent Task Unique ID | ✓ | |||||||||||||||||||||||
Percent Complete Type | ✓ | ✓ | ✓ | |||||||||||||||||||||
Phase of Work | ✓ | |||||||||||||||||||||||
Physical % Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Planned Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Planned Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Planned Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Planned Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Preleveled Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Preleveled Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Primary Resource Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Priority | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Project | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Recalc Outline Codes | ✓ | |||||||||||||||||||||||
Recurring | ✓ | ✓ | ✓ | |||||||||||||||||||||
Recurring Data | ✓ | |||||||||||||||||||||||
Regular Work | ✓ | ✓ | ||||||||||||||||||||||
Remaining Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Remaining Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||
Remaining Early Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Early Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Late Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Late Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
Remaining Work (Labor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Work (Nonlabor) | ✓ | ✓ | ✓ | |||||||||||||||||||||
Resource Names | ✓ | ✓ | ||||||||||||||||||||||
Responsibility Code | ✓ | |||||||||||||||||||||||
Resume | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Resume No Earlier Than | ✓ | |||||||||||||||||||||||
Resume Valid | ✓ | |||||||||||||||||||||||
Rollup | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Scheduled Duration | ✓ | |||||||||||||||||||||||
Scheduled Finish | ✓ | |||||||||||||||||||||||
Scheduled Start | ✓ | |||||||||||||||||||||||
Secondary Constraint Date | ✓ | ✓ | ||||||||||||||||||||||
Secondary Constraint Type | ✓ | ✓ | ||||||||||||||||||||||
Section | ✓ | |||||||||||||||||||||||
Sequence Number | ✓ | ✓ | ✓ | |||||||||||||||||||||
Splits | ✓ | ✓ | ||||||||||||||||||||||
Sprint ID | ✓ | |||||||||||||||||||||||
Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Start Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Start Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
Steps | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |
Stop | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Subproject File | ✓ | ✓ | ✓ | |||||||||||||||||||||
Subproject GUID | ✓ | |||||||||||||||||||||||
Subproject Task ID | ✓ | ✓ | ||||||||||||||||||||||
Subproject Task Unique ID | ✓ | |||||||||||||||||||||||
Subproject Tasks Unique ID Offset | ✓ | |||||||||||||||||||||||
Summary | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Summary Progress | ✓ | |||||||||||||||||||||||
Suspend Date | ✓ | ✓ | ||||||||||||||||||||||
Task Calendar GUID | ✓ | |||||||||||||||||||||||
Task Mode | ✓ | ✓ | ||||||||||||||||||||||
Task Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Total Slack | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Unique ID Successors | ✓ | |||||||||||||||||||||||
WBS | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||
Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
Work Variance | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Baseline Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Baseline1 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline1 Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline1 Duration Units | ✓ | |||||||||||||||||||||||
Baseline1 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline1 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline1 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline1 Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline1 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline1 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline1 Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline1 Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline2 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Duration Units | ✓ | |||||||||||||||||||||||
Baseline2 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline2 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline2 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline2 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline2 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline2 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Duration Units | ✓ | |||||||||||||||||||||||
Baseline3 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline3 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline3 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline3 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline3 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline3 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Duration Units | ✓ | |||||||||||||||||||||||
Baseline4 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline4 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline4 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline4 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline4 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline4 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Duration Units | ✓ | |||||||||||||||||||||||
Baseline5 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline5 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline5 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline5 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline5 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline5 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Duration Units | ✓ | |||||||||||||||||||||||
Baseline6 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline6 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline6 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline6 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline6 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline6 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Duration Units | ✓ | |||||||||||||||||||||||
Baseline7 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline7 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline7 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline7 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline7 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline7 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Duration Units | ✓ | |||||||||||||||||||||||
Baseline8 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline8 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline8 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline8 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline8 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline8 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Duration | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Duration Units | ✓ | |||||||||||||||||||||||
Baseline9 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline9 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline9 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline9 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline9 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline9 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline10 Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline10 Deliverable Finish | ✓ | |||||||||||||||||||||||
Baseline10 Duration | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline10 Duration Units | ✓ | |||||||||||||||||||||||
Baseline10 Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline10 Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline10 Estimated Start | ✓ | |||||||||||||||||||||||
Baseline10 Finish | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline10 Fixed Cost | ✓ | |||||||||||||||||||||||
Baseline10 Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline10 Start | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline10 Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline Budget Cost | ✓ | |||||||||||||||||||||||
Baseline Budget Work | ✓ | |||||||||||||||||||||||
Baseline Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
Baseline Deliverable Finish | ✓ | |||||||||||||||||||||||
Baseline Deliverable Start | ✓ | |||||||||||||||||||||||
Baseline Duration | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Baseline Duration Units | ✓ | |||||||||||||||||||||||
Baseline Estimated Duration | ✓ | |||||||||||||||||||||||
Baseline Estimated Finish | ✓ | |||||||||||||||||||||||
Baseline Estimated Start | ✓ | |||||||||||||||||||||||
Baseline Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Baseline Fixed Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Fixed Cost Accrual | ✓ | |||||||||||||||||||||||
Baseline Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Baseline Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Custom Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Cost2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Cost3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Duration1 Units | ✓ | |||||||||||||||||||||||
Duration2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Duration2 Units | ✓ | |||||||||||||||||||||||
Duration3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Duration3 Units | ✓ | |||||||||||||||||||||||
Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration4 Units | ✓ | |||||||||||||||||||||||
Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration5 Units | ✓ | |||||||||||||||||||||||
Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration6 Units | ✓ | |||||||||||||||||||||||
Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration7 Units | ✓ | |||||||||||||||||||||||
Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration8 Units | ✓ | |||||||||||||||||||||||
Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration9 Units | ✓ | |||||||||||||||||||||||
Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration10 Units | ✓ | |||||||||||||||||||||||
Finish1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Finish2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Finish3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Finish4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Finish5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag6 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag7 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag8 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag9 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag10 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Flag11 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag12 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag13 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag14 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag15 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag16 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag17 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag18 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag19 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag20 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Number1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Number2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Number3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Number4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Number5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Number6 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code1 Index | ✓ | |||||||||||||||||||||||
Outline Code2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code2 Index | ✓ | |||||||||||||||||||||||
Outline Code3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code3 Index | ✓ | |||||||||||||||||||||||
Outline Code4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code4 Index | ✓ | |||||||||||||||||||||||
Outline Code5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code5 Index | ✓ | |||||||||||||||||||||||
Outline Code6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code6 Index | ✓ | |||||||||||||||||||||||
Outline Code7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code7 Index | ✓ | |||||||||||||||||||||||
Outline Code8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code8 Index | ✓ | |||||||||||||||||||||||
Outline Code9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code9 Index | ✓ | |||||||||||||||||||||||
Outline Code10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code10 Index | ✓ | |||||||||||||||||||||||
Start1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text1 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Text2 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text3 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text4 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text5 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text6 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text7 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text8 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text9 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Enterprise Data | ✓ | |||||||||||||||||||||||
Enterprise Duration1 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration2 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration3 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration4 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration5 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration6 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration7 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration8 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration9 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration10 Units | ✓ | |||||||||||||||||||||||
Enterprise Project Date1 | ✓ | |||||||||||||||||||||||
Enterprise Project Date2 | ✓ | |||||||||||||||||||||||
Enterprise Project Date3 | ✓ | |||||||||||||||||||||||
Enterprise Project Date4 | ✓ | |||||||||||||||||||||||
Enterprise Project Number2 | ✓ | |||||||||||||||||||||||
Enterprise Project Number4 | ✓ | |||||||||||||||||||||||
Enterprise Project Number5 | ✓ | |||||||||||||||||||||||
Enterprise Project Number22 | ✓ | |||||||||||||||||||||||
Enterprise Project Text1 | ✓ | ✓ | ||||||||||||||||||||||
Enterprise Project Text2 | ✓ | |||||||||||||||||||||||
Enterprise Project Text3 | ✓ | |||||||||||||||||||||||
Enterprise Project Text4 | ✓ | |||||||||||||||||||||||
Enterprise Project Text5 | ✓ | |||||||||||||||||||||||
Enterprise Project Text6 | ✓ | |||||||||||||||||||||||
Enterprise Project Text8 | ✓ | |||||||||||||||||||||||
Enterprise Project Text9 | ✓ | |||||||||||||||||||||||
Enterprise Project Text10 | ✓ | |||||||||||||||||||||||
Enterprise Project Text11 | ✓ | |||||||||||||||||||||||
Enterprise Project Text12 | ✓ | |||||||||||||||||||||||
Enterprise Project Text13 | ✓ | |||||||||||||||||||||||
Enterprise Project Text14 | ✓ | |||||||||||||||||||||||
Enterprise Project Text15 | ✓ | |||||||||||||||||||||||
Enterprise Project Text16 | ✓ | |||||||||||||||||||||||
Enterprise Project Text17 | ✓ | |||||||||||||||||||||||
Enterprise Project Text18 | ✓ | |||||||||||||||||||||||
Enterprise Project Text19 | ✓ | |||||||||||||||||||||||
Enterprise Project Text21 | ✓ | |||||||||||||||||||||||
Enterprise Project Text40 | ✓ | ✓ |
Resource
Core Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
% Work Complete | ✓ | |||||||||||||||||||||||
ACWP | ✓ | ✓ | ||||||||||||||||||||||
Accrue At | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Active | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Actual Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Actual Work Protected | ✓ | |||||||||||||||||||||||
Availability Data | ✓ | |||||||||||||||||||||||
Available From | ✓ | |||||||||||||||||||||||
Available To | ✓ | |||||||||||||||||||||||
BCWS | ✓ | |||||||||||||||||||||||
Base Calendar | ✓ | |||||||||||||||||||||||
Booking Type | ✓ | ✓ | ||||||||||||||||||||||
Budget | ✓ | ✓ | ||||||||||||||||||||||
Budget Cost | ✓ | |||||||||||||||||||||||
Budget Work | ✓ | |||||||||||||||||||||||
CV | ✓ | |||||||||||||||||||||||
Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Calendar GUID | ✓ | |||||||||||||||||||||||
Calendar Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||
Can Level | ✓ | ✓ | ||||||||||||||||||||||
Code | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Cost Center | ✓ | ✓ | ||||||||||||||||||||||
Cost Per Use | ✓ | |||||||||||||||||||||||
Cost Rate A | ✓ | |||||||||||||||||||||||
Cost Rate B | ✓ | |||||||||||||||||||||||
Cost Rate C | ✓ | |||||||||||||||||||||||
Cost Rate D | ✓ | |||||||||||||||||||||||
Cost Rate E | ✓ | |||||||||||||||||||||||
Cost Variance | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Created | ✓ | ✓ | ✓ | |||||||||||||||||||||
Default Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Description | ✓ | |||||||||||||||||||||||
Email Address | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||
GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Generic | ✓ | ✓ | ||||||||||||||||||||||
Group | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Hyperlink | ✓ | ✓ | ||||||||||||||||||||||
Hyperlink Address | ✓ | |||||||||||||||||||||||
Hyperlink Data | ✓ | |||||||||||||||||||||||
Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
Hyperlink SubAddress | ✓ | |||||||||||||||||||||||
ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Initials | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Material Label | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Max Units | ✓ | |||||||||||||||||||||||
Name | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Notes | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||
Overallocated | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Overtime Rate | ✓ | |||||||||||||||||||||||
Overtime Rate Units | ✓ | |||||||||||||||||||||||
Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Parent ID | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Peak | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Per Day | ✓ | |||||||||||||||||||||||
Phone | ✓ | |||||||||||||||||||||||
Phonetics | ✓ | |||||||||||||||||||||||
Pool | ✓ | |||||||||||||||||||||||
Primary Role Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Rate | ✓ | |||||||||||||||||||||||
Regular Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Resource ID | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Role | ✓ | ✓ | ✓ | |||||||||||||||||||||
SV | ✓ | |||||||||||||||||||||||
Sequence Number | ✓ | ✓ | ✓ | |||||||||||||||||||||
Shift Unique ID | ✓ | ✓ | ||||||||||||||||||||||
Standard Rate | ✓ | |||||||||||||||||||||||
Standard Rate Units | ✓ | |||||||||||||||||||||||
Subproject Unique Resource ID | ✓ | |||||||||||||||||||||||
Supply Reference | ✓ | |||||||||||||||||||||||
Type | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Unit | ✓ | |||||||||||||||||||||||
Unit of Measure Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||
Windows User Account | ✓ | |||||||||||||||||||||||
Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Work Variance | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Workgroup | ✓ | ✓ | ✓ |
Baseline Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Baseline1 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline1 Budget Work | ✓ | |||||||||||||||||||||||
Baseline1 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline1 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline2 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline2 Budget Work | ✓ | |||||||||||||||||||||||
Baseline2 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline2 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline3 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline3 Budget Work | ✓ | |||||||||||||||||||||||
Baseline3 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline3 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline4 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline4 Budget Work | ✓ | |||||||||||||||||||||||
Baseline4 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline4 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline5 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline5 Budget Work | ✓ | |||||||||||||||||||||||
Baseline5 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline5 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline6 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline6 Budget Work | ✓ | |||||||||||||||||||||||
Baseline6 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline6 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline7 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline7 Budget Work | ✓ | |||||||||||||||||||||||
Baseline7 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline7 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline8 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline8 Budget Work | ✓ | |||||||||||||||||||||||
Baseline8 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline8 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline9 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline9 Budget Work | ✓ | |||||||||||||||||||||||
Baseline9 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline9 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline10 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline10 Budget Work | ✓ | |||||||||||||||||||||||
Baseline10 Cost | ✓ | ✓ | ||||||||||||||||||||||
Baseline10 Work | ✓ | ✓ | ||||||||||||||||||||||
Baseline Budget Cost | ✓ | |||||||||||||||||||||||
Baseline Budget Work | ✓ | |||||||||||||||||||||||
Baseline Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Work | ✓ | ✓ | ✓ | ✓ |
Custom Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration1 Units | ✓ | |||||||||||||||||||||||
Duration2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration2 Units | ✓ | |||||||||||||||||||||||
Duration3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration3 Units | ✓ | |||||||||||||||||||||||
Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration4 Units | ✓ | |||||||||||||||||||||||
Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration5 Units | ✓ | |||||||||||||||||||||||
Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration6 Units | ✓ | |||||||||||||||||||||||
Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration7 Units | ✓ | |||||||||||||||||||||||
Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration8 Units | ✓ | |||||||||||||||||||||||
Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration9 Units | ✓ | |||||||||||||||||||||||
Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration10 Units | ✓ | |||||||||||||||||||||||
Finish1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag1 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag5 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag6 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag7 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag8 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag9 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag10 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag11 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag12 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag13 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag14 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag15 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag16 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag17 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag18 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag19 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Flag20 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Number1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code1 Index | ✓ | |||||||||||||||||||||||
Outline Code2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code2 Index | ✓ | |||||||||||||||||||||||
Outline Code3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code3 Index | ✓ | |||||||||||||||||||||||
Outline Code4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code4 Index | ✓ | |||||||||||||||||||||||
Outline Code5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code5 Index | ✓ | |||||||||||||||||||||||
Outline Code6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code6 Index | ✓ | |||||||||||||||||||||||
Outline Code7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code7 Index | ✓ | |||||||||||||||||||||||
Outline Code8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code8 Index | ✓ | |||||||||||||||||||||||
Outline Code9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code9 Index | ✓ | |||||||||||||||||||||||
Outline Code10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Outline Code10 Index | ✓ | |||||||||||||||||||||||
Start1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text1 | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||||
Text2 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Text3 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Text4 | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Text5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Enterprise | ✓ | ✓ | ||||||||||||||||||||||
Enterprise Data | ✓ | |||||||||||||||||||||||
Enterprise Duration1 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration2 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration3 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration4 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration5 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration6 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration7 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration8 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration9 Units | ✓ | |||||||||||||||||||||||
Enterprise Duration10 Units | ✓ | |||||||||||||||||||||||
Enterprise Unique ID | ✓ |
Resource Assignment
Core Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
ACWP | ✓ | ✓ | ||||||||||||||||||||||
Actual Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Actual Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Actual Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Actual Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Actual Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Actual Work Protected | ✓ | |||||||||||||||||||||||
Assignment Delay | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Assignment GUID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Assignment Resource GUID | ✓ | |||||||||||||||||||||||
Assignment Task GUID | ✓ | |||||||||||||||||||||||
Assignment Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
BCWS | ✓ | |||||||||||||||||||||||
Budget Cost | ✓ | ✓ | ||||||||||||||||||||||
Budget Work | ✓ | ✓ | ||||||||||||||||||||||
CV | ✓ | |||||||||||||||||||||||
Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Confirmed | ✓ | |||||||||||||||||||||||
Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Cost Account ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost Rate Table | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
Created | ✓ | ✓ | ||||||||||||||||||||||
Finish | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Finish Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
Hyperlink | ✓ | ✓ | ✓ | |||||||||||||||||||||
Hyperlink Address | ✓ | ✓ | ✓ | |||||||||||||||||||||
Hyperlink Data | ✓ | |||||||||||||||||||||||
Hyperlink Screen Tip | ✓ | |||||||||||||||||||||||
Hyperlink Subaddress | ✓ | ✓ | ✓ | |||||||||||||||||||||
Leveling Delay | ✓ | ✓ | ||||||||||||||||||||||
Leveling Delay Units | ✓ | |||||||||||||||||||||||
Linked Fields | ✓ | |||||||||||||||||||||||
Notes | ✓ | ✓ | ✓ | |||||||||||||||||||||
Override Rate | ✓ | ✓ | ✓ | |||||||||||||||||||||
Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Owner | ✓ | |||||||||||||||||||||||
Percent Work Complete | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||
Planned Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Planned Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Rate Index | ✓ | ✓ | ||||||||||||||||||||||
Rate Source | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Regular Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Assignment Units | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Remaining Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||
Remaining Early Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Early Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Late Finish | ✓ | ✓ | ||||||||||||||||||||||
Remaining Late Start | ✓ | ✓ | ||||||||||||||||||||||
Remaining Overtime Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Overtime Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Remaining Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||
Resource Request Type | ✓ | |||||||||||||||||||||||
Resource Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Response Pending | ✓ | ✓ | ||||||||||||||||||||||
Resume | ✓ | ✓ | ✓ | |||||||||||||||||||||
Role Unique ID | ✓ | ✓ | ✓ | |||||||||||||||||||||
SV | ✓ | |||||||||||||||||||||||
Start | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||||||||||
Start Variance | ✓ | ✓ | ✓ | |||||||||||||||||||||
Stop | ✓ | ✓ | ✓ | |||||||||||||||||||||
Task Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Team Status Pending | ✓ | ✓ | ||||||||||||||||||||||
Timephased Actual Overtime Work | ✓ | |||||||||||||||||||||||
Timephased Actual Work | ✓ | |||||||||||||||||||||||
Timephased Work | ✓ | |||||||||||||||||||||||
Unique ID | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
Variable Rate Units | ✓ | ✓ | ||||||||||||||||||||||
Work | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
Work Contour | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||||||||||||||||
Work Variance | ✓ | ✓ | ✓ |
Baseline Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Baseline1 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline1 Budget Work | ✓ | |||||||||||||||||||||||
Baseline1 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline1 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline1 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline1 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline2 Budget Work | ✓ | |||||||||||||||||||||||
Baseline2 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline2 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline3 Budget Work | ✓ | |||||||||||||||||||||||
Baseline3 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline3 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline4 Budget Work | ✓ | |||||||||||||||||||||||
Baseline4 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline4 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline5 Budget Work | ✓ | |||||||||||||||||||||||
Baseline5 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline5 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline6 Budget Work | ✓ | |||||||||||||||||||||||
Baseline6 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline6 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline7 Budget Work | ✓ | |||||||||||||||||||||||
Baseline7 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline7 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline8 Budget Work | ✓ | |||||||||||||||||||||||
Baseline8 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline8 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline9 Budget Work | ✓ | |||||||||||||||||||||||
Baseline9 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline9 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline10 Budget Cost | ✓ | |||||||||||||||||||||||
Baseline10 Budget Work | ✓ | |||||||||||||||||||||||
Baseline10 Cost | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline10 Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline10 Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline10 Work | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Budget Cost | ✓ | |||||||||||||||||||||||
Baseline Budget Work | ✓ | |||||||||||||||||||||||
Baseline Cost | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Baseline Finish | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Start | ✓ | ✓ | ✓ | |||||||||||||||||||||
Baseline Work | ✓ | ✓ | ✓ | ✓ | ||||||||||||||||||||
Timephased Baseline1 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline1 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline2 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline2 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline3 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline3 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline4 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline4 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline5 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline5 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline6 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline6 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline7 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline7 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline8 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline8 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline9 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline9 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline10 Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline10 Work | ✓ | |||||||||||||||||||||||
Timephased Baseline Cost | ✓ | |||||||||||||||||||||||
Timephased Baseline Work | ✓ |
Custom Fields
Field | Asta (PP) | ConceptDraw PROJECT (CDP) | Deltek OpenPlan (BK3) | FastTrack (FTS) | GanttDesigner (GNT) | GanttProject (GAN) | Merlin (SQLITE) | Microsoft (MPD) | Microsoft (MPP) | Microsoft (MPX) | Microsoft (MSPDI) | P3 (BTRIEVE) | Phoenix (PPX) | Planner (XML) | Primavera (PMXML) | Primavera (SQLITE) | Primavera (XER) | Project Commander (PC) | ProjectLibre (POD) | SDEF (SDEF) | Sage (SCHEDULE_GRID) | SureTrak (STW) | Synchro (SP) | TurboProject (PEP) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Cost10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Date10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration1 Units | ✓ | |||||||||||||||||||||||
Duration2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration2 Units | ✓ | |||||||||||||||||||||||
Duration3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration3 Units | ✓ | |||||||||||||||||||||||
Duration4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration4 Units | ✓ | |||||||||||||||||||||||
Duration5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration5 Units | ✓ | |||||||||||||||||||||||
Duration6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration6 Units | ✓ | |||||||||||||||||||||||
Duration7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration7 Units | ✓ | |||||||||||||||||||||||
Duration8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration8 Units | ✓ | |||||||||||||||||||||||
Duration9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration9 Units | ✓ | |||||||||||||||||||||||
Duration10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Duration10 Units | ✓ | |||||||||||||||||||||||
Finish1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Finish10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Flag20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Number20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Start10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text1 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text2 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text3 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text4 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text5 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text6 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text7 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text8 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text9 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text10 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text11 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text12 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text13 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text14 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text15 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text16 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text17 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text18 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text19 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text20 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text21 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text22 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text23 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text24 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text25 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text26 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text27 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text28 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text29 | ✓ | ✓ | ✓ | |||||||||||||||||||||
Text30 | ✓ | ✓ | ✓ |